Why West Texas Needs More Power

Texas Is Growing Faster Than Its Power Supply

Texas continues to experience unprecedented growth in population, industry, and technology. Meeting tomorrow’s energy needs requires thoughtful investment in modern, reliable infrastructure today.

Images are for illustrative purposes only. Does not depict the actual facility.

Power Demand

Texas Is Changing

For illustrative purposes only. Does not depict the actual facility.

The Texas economy of 2035 will not look like the Texas economy of years past.

Population continues to climb, and with it residential and commercial demand. Manufacturing has returned to the state at a scale not seen in decades, bringing industrial load with it. Energy production across the Permian Basin has grown, and the operations producing that energy are converting from diesel to electric power. Technology infrastructure, particularly large computing and technology facilities, has arrived with power requirements measured in hundreds of megawatts per site.

Each of these trends is independently significant. Together they represent a structural change in how much electricity Texas needs and how reliably it needs to be delivered.

The driving demands in Texas:

A Fast-Growing Population

Texas continues to add residents faster than nearly every other state. Every new household, business, and public facility adds electricity demand.

Expanding Industry

Industrial development across the state continue to grow, and industrial load is among the most power-intensive on the grid.

A Projected Shortfall

ERCOT projects a supply deficit in the Far West region on the order of 20.9 GW by 2030.

Grid Reliability

Generation that runs on demand is what supports homes, businesses, and critical infrastructure when demand peaks.

Grid Reliability

What Reliable Power Actually Means

Because electricity must be generated at the moment it is used, a stable grid requires dispatchable power to bridge the gap between continuous demand and intermittent renewable generation.

On-Demand Generation

RUNNING WHEN NEEDED, NOT JUST WHEN CONDITIONS ALLOW

Connecting the Basin

$60 BILLION IN APPROVED ERCOT TRANSMISSION EXPANSION

Location

Why West Texas Matters

By leveraging the Permian Basin’s abundant natural gas to meet rapid regional demand, generation built today serves local load immediately while capitalizing on $60 billion in upcoming transmission expansion, including new 345-kV and 765-kV pathways, is set to convert the region from a constrained power island into a connected, export-capable hub.

Learn More

Frequently Asked Questions

Several trends at once. Population and commercial growth, a return of manufacturing investment to the state, electrification of oilfield operations that previously ran on diesel, and large computing and technology facilities, all which require large amounts of continuous power.

The Electric Reliability Council of Texas operates the electrical grid serving most of the state. Unlike most of the country, the ERCOT grid operates largely independently of the two major national interconnections, which means Texas manages its own supply and demand balance.

Generation that can be called on when it is needed, rather than producing only when conditions allow. A gas plant is dispatchable. Wind and solar are not, because their output depends on weather. A stable grid needs both, and the dispatchable portion becomes more important as demand grows.

It has abundant, low-cost natural gas, rapidly growing local demand, and existing industrial infrastructure. Historically it has also been transmission constrained, which is why generation built locally can serve regional load without waiting for new transmission.

Reliable power is a prerequisite for industrial investment. Manufacturers and industrial producers site facilities where they can count on supply. Beyond that, construction and operation of a facility generate direct employment, local business demand, and tax revenue.

Power plants take years to develop and operate for decades. The capacity available in 2035 depends on decisions made now.

What Comes Next

A Scalable Solution for Texas

Explore our engineered power solution or contact us for more information.