Solution

220 MW of Firm Power, Built Where Texas Needs It

Trans Permian Energy is developing a combined-cycle power facility in Pecos County, Texas, converting local natural gas into reliable, around-the-clock electricity with carbon capture integrated from the design stage.

Images are for illustrative purposes only. Does not depict the actual facility.

Project Overview

The Project

For illustrative purposes only. Does not depict the actual facility.

The Trans Permian Energy project is a 220 MW combined-cycle power facility under development on approximately 1,000 owned acres in Pecos County, Texas, roughly 15 miles northeast of Fort Stockton, inside the ERCOT West Load Zone.

The facility converts locally produced natural gas into low-carbon hydrogen, then uses that hydrogen to generate electricity through a combined-cycle power island. Carbon dioxide released during hydrogen production is captured and directed to enhanced oil recovery in the Permian Basin rather than vented.

The design is deliberately phased. Phase 1 delivers 220 MW and is scalable toward 500 MW. The platform as a whole is engineered to grow beyond 1 GW across subsequent phases, on land and infrastructure already secured.

Location

Pecos County, Texas

Approximately 15 miles northeast of Fort Stockton

Market

ERCOT West Load Zone

Phase 1 capacity

220 MW

Scalability

Toward 500 MW in Phase 1

Beyond 1 GW across later phases

Generation

Combined cycle, hydrogen-capable

Hydrogen production

~138 tonnes per day

Blue hydrogen via natural gas reforming with integrated capture

Carbon capture

~1,130 tonnes of CO2/day

Directed to enhanced oil recovery

On-site renewable power

~24 MW

Integrated to support hydrogen production

Effective availability

~97%

Roughly 355 days per year

Effective availability

~97%

Roughly 355 days per year

Site

~1,000 owned acres

Water

Permit issued

For ~4.1 million gallons/day

Access

Hard-top county road

Fiber connectivity

Status

In development

Why This Project Is Different

Not a Conventional Gas Plant

For illustrative purposes only. Does not depict the actual facility.

Most new gas generation burns natural gas directly in a turbine. This facility does something different: it converts the gas into hydrogen first, captures the carbon released in that conversion, and then generates electricity by burning the hydrogen.

That extra step is the whole point. It is where the carbon comes out. In a conventional plant, carbon dioxide leaves through the exhaust stack diluted in a large volume of flue gas, which makes capture difficult and expensive. Capturing it during hydrogen production, where the CO2 stream is concentrated, is far more practical.

The result is generation that runs when it is called, at a carbon intensity fundamentally different from conventional gas-fired power, produced from the same abundant local fuel.

Each individual technology involved is commercially established. The combination of hydrogen reforming, carbon capture, and hydrogen-capable combined-cycle generation integrated into a single system has not been deployed in an inland Permian context.

Hydrogen Pathway

Natural gas converted to hydrogen before combustion, which is what makes practical carbon capture possible.

Integrated Carbon Capture

Approximately 1,130 tonnes of CO2 captured per day and directed to enhanced oil recovery in the Permian Basin.

Modern Combined Cycle

Two stages of generation from the same fuel, delivering higher efficiency than simple-cycle equipment.

Hydrogen-Capable Equipment

Generation designed for hydrogen from the outset rather than converted to it later.

Local Fuel Advantage

Permian natural gas priced at a discount to national benchmarks, delivering a durable dispatch advantage.

Alternative Behind-the-Meter Delivery

Firm power supplied directly to nearby load, independent of long-lead transmission buildout.

On-Site Renewable Integration

Approximately 24 MW of renewable power supporting hydrogen production and lowering carbon intensity.

Designed for Scale

A phased platform engineered to grow from 220 MW toward 1 GW and beyond.

Designed for Growth

A Platform, Not a Plant

By establishing core infrastructure during its initial 220 MW deployment, the project creates a scalable platform capable of rapidly adding future generation.

Adaptable Design

Hydrogen-capable equipment able to accommodate a changing fuel mix over the asset’s life

1,000 Acres

OWNED LAND SUPPORTING PHASED EXPANSION

Strategic Advantages

Why West Texas Matters

Supporting Texas’ Future

What This Project Delivers

Delivering firm, locally fueled power exactly where ERCOT needs it most provides industrial operators with immediate capacity while creating sustained jobs and tax revenue for Pecos County.

01

Reliable Electricity

Capacity available around the clock, on demand.

02

Energy Security

Domestic fuel converted to domestic power for domestic industry.

03

Industrial Growth

Reliable supply enabling manufacturing and oilfield expansion across the basin.

04

Economic Development

Construction investment and sustained demand for regional businesses.

05

Job Creation

Skilled construction trades during the build and permanent technical positions in operations.

06

Infrastructure Investment

Long-lived assets built to current standards in a growing region.

Development Timeline

Development Roadmap

Tracking the targeted milestones for the Trans Permian Energy project.

Project development and site control
Complete
Pre-feasibility engineering and design
Complete
Engineering
Complete
Air permitting
In progress
Interconnection study
In progress
Financing
In progress
Construction
Upcoming
Commissioning
Upcoming
Commercial operation
Upcoming

Learn More

Frequently Asked Questions

In Pecos County, Texas, approximately 15 miles northeast of Fort Stockton, on roughly 1,000 owned acres inside the ERCOT West Load Zone.

Phase 1 is designed for 220 MW, scalable toward 500 MW. The platform is engineered to grow beyond 1 GW across subsequent phases.

Because the fuel, the demand, and the infrastructure are all there. The Permian Basin produces abundant natural gas at a discount to national benchmarks. Industrial and computing demand in the region is growing quickly. And the site holds secured land, permitted water rights, road access, and fiber connectivity.

Natural gas reforming to produce low-carbon hydrogen, integrated carbon capture, and hydrogen-capable combined-cycle generation. Each is commercially established. The combination is what is new.

By adding capacity that runs on demand in the region where ERCOT projects the largest supply shortfall, and by doing it with local fuel delivered to local load, without waiting on long-lead transmission construction.

Yes. The project was designed in phases specifically to allow it. Land, water rights, and site infrastructure were secured with expansion in mind.

Approximately 1,130 tonnes per day are captured and directed to enhanced oil recovery in the Permian Basin, where the CO2 is injected underground to produce additional domestic oil and remains in geologic storage.

Learn more

The Right Energy Technology for West Texas

Learn more about the need for reliable energy in the region, and the technology we are deploying to meet it.